Find your zoning
Use the municipality’s official zoning map to identify your zone. Read the permitted uses and any property-specific exceptions. Ask whether your proposal is treated as a main or accessory building.

Planning Your Build
Start with your property’s rules. Then work out the drawings and approvals you need before moving ahead.
A starting guide for Ontario projects. Your municipality confirms the requirements for your property and intended use.
Have the property address or roll number and a clear description of how you plan to use the building.
Use the municipality’s official zoning map to identify your zone. Read the permitted uses and any property-specific exceptions. Ask whether your proposal is treated as a main or accessory building.
Find the height limit in the applicable bylaw, then ask planning staff how height is measured for your roof shape and ground level. Include the roof pitch when discussing your design.
Low eave ≠ overall height. The height entered in our Building Design Tool is the low eave. The roof rises above it; confirm the municipality’s measurement method before choosing your final height.
Confirm setbacks from property lines and other buildings, permitted lot coverage and any accessory-building size limits. Ask whether easements or site restrictions affect where you can build.
Start with your municipality’s planning department. Read Ontario’s zoning guide ↗
Request the local application checklist early. The package depends on the building’s use, size and location.
| What is usually needed | What it explains | Who to confirm it with |
|---|---|---|
| Site plan | Property boundaries, existing and proposed buildings, dimensions and setbacks. A survey or grading plan may also be required. | Your municipality and a site professional, where needed. |
| Building drawings | Floor plans, elevations, sections and structural details for the proposed building. | Trillium for the drawings included in your package; your project designer for the complete submission. |
| Foundation design | The foundation and anchorage needed for the building and site conditions. | Your project designer or engineer. Confirm who supplies it before ordering. |
| Other approvals | Site plan, conservation, septic, entrance or servicing approvals, if applicable. | Your municipality and the relevant approval authority. |
| Application and fees | Completed forms, required supporting documents and the application fee. | You or your appointed applicant, using the municipality’s checklist. |
The municipality reviews the submission and may request changes or further information. Obtain the required permits before starting the relevant work, then arrange inspections at the stages it specifies.
Catalogue drawings and tool previews are concepts; confirm the project-specific drawing scope in your written quote. Ontario permit guide ↗ · Example municipal checklist: Hamilton ↗
Copy this enquiry, fill in the brackets and send it to your municipality’s planning or building department.
Your next step
Once you know the permitted use, height and setbacks, explore dimensions, roof shape, doors, windows and colours.
Open the Building Design Tool ↗You can explore a concept while you wait for a reply. Confirm the property rules before finalising it.